March Construction project at sunrise

Before You Commit $20M+, Find Out If Your Estimate Holds.

Don't risk millions on an unchecked construction estimate: Identify potential risks before they reach the field.

Request Your Free Project Risk Assessment →

For qualified $20M+ multifamily, retail, and industrial projects.
Reviewed by an ENR Top 400 builder.

Your Project Risk Assessment

Find the Risks in Your Estimate Before You Go to Bid.

What the assessment covers

  • ✓ Pre-construction review of your plans and estimate
  • ✓ Key execution risks identified before bid
  • ✓ Constructability review
  • ✓ Early value engineering opportunities
  • ✓ Schedule and lead-time test

How it works

  1. 1
    Book your call. Pick a time that works for you.
  2. 2
    Share your plans and estimate. We review them from the builder’s side.
  3. 3
    See what your estimate is missing. We walk you through the risks we found, before they reach the field.
Why Test Your Estimate Before You Bid?

An Inaccurate Construction Estimate Could Cost You Millions.

Your architect or engineer gave you a construction estimate, and you’re ready to go to bid. But if an experienced construction manager hasn’t checked the assumptions behind it, you could be making a multimillion-dollar mistake:

Scope gaps surface after the bidChange orders add upInterest keeps tickingYour returns shrink.

Unvalidated Bid vs. March TrueValue™

Construction Should Be Predictable, Not Stressful.

Validating early reduces risk on both sides of the table, for you and for March.

Typical Unvalidated Bid
March TrueValue™
Price first
Validation first
Assumptions buried
Assumptions documented
VE after budget pain
VE before drawings lock
Contingency hidden
Risk itemized
Surprises in the field
Risks flagged in precon

The difference with March: we don’t use a generic checklist.

Other contractors may review the same project, but they don’t have March’s data, March’s estimators, or March’s 40+ years of project history behind that review.

It’s the thinking behind the March TrueValue™ System, our full pre-construction process.

See Our Track Record
Track Record

Built on Decades.
Measured in Delivery.

12.5B+Projects Delivered
40+Years of Experience
ENRTop 400 Builder
Multifamily · Industrial · Mixed-Use · Retail
Testimonials

What Our Clients Say

Free Project Risk Assessment

Don’t risk millions on an unchecked estimate.

Pick a time that works for you.

Move forward with March, and the full TrueValue™ process takes it deeper to build the most competitive, defensible construction cost possible.